To speak with an interpreter, please contact SCDOT at 803-724-5862 or toll free at 888-468-8081. Para hablar con un intérprete, comuníquese con SCDOT al 803-724-5862 o gratis al 888-468-8081.

S-149 (W Faris Rd) over Brushy Creek Bridge Replacement

SCDOT Home Page
FHWA Home Page

Welcome to the S-149 (W. Faris Rd.) Bridge Replacement over Brushy Creek Online Public Information Website!

The purpose of this public information meeting is to:

  • provide an opportunity for you to review the project
  • gather input on the project

All meeting materials that would be available in-person are available here, including a project handout, comment card, and proposed design displays for viewing and/or download.

IN-PERSON: Tuesday, July 30, 2024 | 5p.m.-7 p.m. | St. George Greek Orthodox Church | 406 N Academy St, Greenville, SC 29601.

Documents available for download:

We want to hear from you!

You may provide your comments in multiple ways:

  1. Mail comments:
    • Download a comment card and mail comments to:
    • Trey Brown, P.E.
    • SCDOT
    • 955 Park Street
    • P.O. Box 191
    • Columbia, SC 29201-3959
  2. Provide comments online:
  3. Email your comments to the following email address: BrownWT@scdot.org

Please submit your comments by August 15, 2024, for inclusion in the project record. All written comments received within the comment period will be evaluated, responded to, and included in the public record. All information provided will be published and is subject to disclosure under the Freedom of Information Act. (FOIA).

Purpose and Need

The purpose of this project is to replace the aging W Faris Road (S-149) bridge over Brushy Creek which was built in 1969. The project is part of SCDOT’s Strategic 10 year Plan to greatly reduce the number of closed and load restricted bridges in the State of South Carolina.

Project Description

The South Carolina Department of Transportation (SCDOT) proposes to replace the W Faris Road (S-149) bridge over Brushy Creek in Greenville County, South Carolina. It is anticipated that the new bridge will be constructed on or near existing alignment. Following the National Environmental Policy Act (NEPA), SCDOT will be analyzing alternatives to determine if the new bridge will be constructed off alignment or through the use of a closure and detour.

For more information on the NEPA process click here.


Anticipated Schedule
Preliminary Engineering: Underway
Public Outreach: Underway
Right of Way: Winter 2024
Construction: Winter 2025