Purpose and Need
The purpose of this proposed project is to improve drainage along Roper Mountain Road between Weatherby Drive & Battery Boulevard.
About the Project
The South Carolina Department of Transportation proposes to improve the drainage on Roper Mountain Road (S-548) between Weatherby Drive & Battery Boulevard. These proposed improvements include modifying the existing ditches, placing and enhancing cross line pipes, constructing a closed drainage system, and placing a new catch basin at the Green Arbor Lane intersection that will help alleviate localized flooding in this location.
Project Design
Right of Way Acquisitions Begin: | Completed |
---|---|
Construction Plans Completed: | TBD* |
* Construction Plans awaiting additional funds. |